Architect Stock Woolstencroft has been given the green light for six mixed-use buildings rising up to 43 storeys at the main entrance to the Olympic park.

The 1.3ha project is being backed by developer Genesis Housing Group and will be built before the Games start in 2012. Cost consultant is Gardiner & Theobald and structural engineer is WSP.