Keep up to dateTABLE 1: SERVICES EQUIPMENT THAT WAS RETAINED, REFURBISHED OR REPLACED | ||
Retained | Refurbished | Replaced |
Motor control panels | Roof ahu | Humidifiers |
Sprinkler system | Halon fire protection system | Cold water storage tank |
14 heating/cooling coils | Cooling towers | All ductwork |
Water chillers | Passenger/fire-fighting lifts | One pressurisation unit |
HV transformers | Water treatment plant | 13 heating/cooling coils |
LV switchgear panel | Pumps | |
One pressurisation unit | VAV units | |
Sill line heating | ||
Fire alarm system | ||
Gas-fired boilers | ||