- News
All the latest updates on building safety reformRegulations latest
- Focus
All the latest updates on building safety reform
Technical iinformation | |
Farnborough Airport, Hampshire | |
Engineering data | |
Gross floor area | |
ground | 595 m2 |
first floor | 391 m2 |
sub-equipment level | 50 m2 |
VCR | 50 m2 |
Net usable area | |
ground | 576 m2 |
first floor | 365·4 m2 |
sub-equipment | 26·3 m2 |
VCR | 26 m2 |
Plant rooms | 130 m2 |
Contract details | |
Tender date | August 2001 |
Form of contract | Two stage main contract, m&e traditional single stage |
Contract period | December 2001 to January 2003 |
Was National Engineering Specification used on this project? | Yes |
External design conditions | |
Winter | -5 °C, 90% rh |
Summer (a/c) | 28°C db, 20°C wb |
Internal design conditions | |
Winter | 21°C +/-2°C, 50% rh +/-20% |
Summer (non a/c) | No control |
Summer (a/c) | 23°C +/-2°C, 50% rh +/-20% |
Circulation and toilets | Winter 21°C +/-2°C |
U-Values | |
Walls | 0·27 W/m2K |
Floor | 0·35 W/m2K |
Roof | 0·29 W/m2K |
Glazing | 1·9 W/m2K |
Structural details | |
Slab thickness | 250 mm |
Clear floor void | 350 mm |
Floor to ceiling | varies |
Ceiling zone | varies |
Net services zone: | 250-300 mm |
Live load | 5 KN/m2 |
Dead load | 1 KN/m2 |
Occupancy | |
Offices | one person/10 m2 |
Meeting room | 12 persons |
Noise levels | |
Offices | NR 30 |
Toilet and circulation | NR 40 |
External breakout limits | NR 50 1·5 m from louvre face |
BREEAM rated? | NO |
Ventilation | |
Scheduled supply air temperature | 18°C |
Room temperature | 18°C minimum, 25°C maximum |
Fresh air | 12 litres/s/per person |
Maximum recirculation | 100% fresh air |
Filtration | EU category EU5 |
Primary air volumes | |
AHUs at | 1·555 m3/s supply |
AHUs at | 1·018 m3/s extract |
Distribution circuits | |
LTHW | 82°C flow, 71°C return |
Refrigerant | R407c |
Electrical supply | |
Transformers | 500 kVA |
UPS system | 80 kVA |
Standby power | 380 kVA |
Lux levels | |
Office | 300-500 |
Conference | 300-500 |
Toilets | 150 |
Circulation areas | 200-300 |
Lifts | |
Passenger | 8 person, 1 m/s |