Whole-life cost of Egg, Pride Park, Derby compared with Prudential, Point North, Dudley
Egg, Pride Park,
Derby
      Prudential, Point
North, Dudley
       Cost
variance
 
Total
cost (£)
Cost/m2 (£) Cost/
workstation (£)
% of cost Total
cost (£)
Cost/m2 (£) Cost/
workstation (£)
% of cost %/m2 %/ work
station
Capital and finance                    
Build/fit-out cost 14 660 000 978.83 11 728.00 7.17 10 621 300 1 185.68 10 332.00 6.29 21 –12
Finance cost (real) 11 050 300 737.82 8 840.24 5.40 8 006 000 893.73 7 787.94 4.74 21 –12
Rent on shell, insurance
and rates
50 693 400 3 384.75 40 554.72 24.78 43 945 600 4 905.74 42 748.64 26.02 45 5
Total building cost 76 403 700 5 101.40 61 122.96 37.35 62 572 900 6 985.14 60 868.58 37.05 37 0
Occupancy                    
M&E maintenance 3 233 500 215.90 2 586.80 1.58 2 127 400 237.49 2 069.46 1.26 10 –20
Lifts 56 500 3.77 45.20 0.03 44 000 4.91 42.80 0.03 30 –5
Fabric 50 000 3.34 40.00 0.02 50 000 5.58 48.64 0.03 67 22
Planned replacements 10 781 400 719.86 8 625.12 5.27 7 811 200 871.98 7 598.44 4.63 21 –12
External land 410 000 27.38 328.00 0.20 935 000 104.38 909.53 0.55 281 177
Internal planting 90 000 6.01 72.00 0.04 90 000 10.05 87.55 0.05 67 22
Cleaning 3 727 200 248.86 2 981.76 1.82 3 714 900 414.70 3 613.72 2.20 67 21
Waste 625 000 41.73 500.00 0.31 528 800 59.03 514.40 0.31 41 3
Electricity 5 700 000 380.58 4 560.00 2.79 3 792 700 423.39 3 689.40 2.25 11 –19
Gas 1 900 000 126.86 1 520.00 0.93 704 100 78.60 684.92 0.42 –38 –55
Water 100 000 6.68 80.00 0.05 76 700 8.56 74.61 0.05 28 –7
Internal moves 117 200 7.83 93.76 0.06 220 625 24.63 214.62 0.13 215 129
Security and reception 5 152 600 344.03 4 122.08 2.52 4 448 700 496.62 4 327.53 2.63 44 5
Post room 4 290 000 286.44 3 432.00 2.10 4 290 000 478.90 4 173.15 2.54 67 22
IT/communications 84 333 300 5 630.85 67 466.64 41.23 72 371 200 8 078.95 70 400.00 42.86 43 4
Catering 5 790 900 386.65 4 632.72 2.83 3 236 900 361.34 3 148.74 1.92 –7 –32
Management 1 787 500 119.35 1 430.00 0.87 1 852 500 206.80 1 802.04 1.10 73 26
Sub-total 128 145 100 8 556.13 102 516.08 62.65 106 294 725 11 865.90 103 399.54 62.95 39 1
Total over 25 years 204 548 800 13 657.53 163 639.04 100.00 168 867 625 18 851.04 164 268.12 100.00 38 0
Statistics                    
Cost/m2 13 658       18 851        
Cost/workstation 163 639       164 268        
Annual cost/workstation 6 546       6 571        
Estimated building infrastructure
cost/ call handled
  1.22       3.82        
Vital statistics
Egg, Pride Park, Derby Prudential Banking, Point North, Dudley
   
Location East Midlands West Midlands
Function Retail communications centre HQ and retail call centre
Workstations 1250 1028
Area 14 977 m2 8 958 m2
Occupation density 11.98 m2/occupant 8.71 m2/occupant
Hours of operation 16 hours/day 16 hours/day
Projected annual calls 6 723 000 1 766 000
Planned life 25 years 25 years
Comment on difference between Egg, Pride Park, Derby and Prudential, Point North, Dudley
Egg, Pride Park, Derby Prudential, Point North, Dudley Comments
M&E maintenance All planned and reactive maintenance. Resident multiskilled engineer 9am-5pm for reactive maintenance and works to non-core areas All planned and reactive maintenance. Resident multiskilled engineer 9am-5pm for reactive maintenance and works to non-core areas Cost reflects lower maintenance liability of the design of Pride Park
Lifts Two hydraulic lifts and two disabled lifts to mezzanines Three hydraulic lifts Cost difference is because of different number of lifts
Fabric All reactive maintenance All reactive maintenance Fabric maintenance is related to probability of incident rather than building size
Planned replacements     Cost reflects low maintenance liability of the design of Pride Park
External landscaping Mixture of high and low maintenance
one full-time head gardener
Weekly attendance by contractor during growing season. Occasional attendance in winter Cost difference reflects low/medium maintenance
requirement of soft landscaping at Pride Park. Point
North has several water / high maintenance features
Cleaning Daily general cleaning (outside core hours), daytime attendance, weekly low-level and quarterly high-level window cleaning and quarterly specialist IT cleaning Daily general cleaning (outside core hours), daytime attendance, weekly low-level and quarterly high-level window cleaning and quarterly specialist IT cleaning Cost difference is partly caused by economies of scale achievable in supervision and management in Derby. However, a major factor in cost is that Derby has minimal elevational glazing
Waste Daily general removal, monthly confidential waste
removal, monthly recycled waste removal
Daily general removal, monthly confidential waste
removal, monthly recycled waste removal
Cost difference reflects difference in confidential waste removal frequencies
Electricity     Cost difference is because of higher small power requirement at Derby
Gas     Cost difference reflects the fact that Point North benefits from higher heat gain than Pride Park
Water     Cost difference is because of water features at Point North
Internal moves 15% churn rate 25% churn rate Cost difference is due to increased number of project teams in Point North
Security and reception Monday-Friday, 7am-7pm: three guards on patrol
and control room observation, supervisor,
receptionist. Other times: two guards, supervisor
Monday-Friday, 7am-7pm: two guards on patrol
and control room observation, supervisor,
receptionist. Other times: two guards, supervisor
Cost difference reflects economies of scale achieved through enlarged Pride Park centre
Post room 12 staff 12 staff  
IT/communications Three-year replenishment rate Three-year replenishment rate Pride Park benefits from economies of scale in network and desktop support
Catering Subsidised canteen/vending, corporate entertaining Subsidised canteen/vending, corporate entertaining  
Management Logistics co-ordinator (shared), site-bound FM, security manager (shared) Logistics co-ordinator (shared), site-bound FM, security manager (shared)  
Whole-life cost of the model call centre compared with Egg, Pride Park, Derby
Model call centre       Egg, Pride Park, Derby       Cost variance  
Tota cost (£) Cost/m2 (£) Cost/workstation (£) % of cost Total cost (£) Cost/m2 (£) Cost/workstation (£) % of cost %/m2 %/ work station
Capital and finance                    
Build/fit-out cost 6 600 000 1 200.00 14 666.67 7.57 14 660 000 978.83 11 728.00 7.17 –18 –20
Finance cost 4 974 900 904.53 11 055.33 5.70 11 050 300 737.82 8 840.24 5.40 –18 –20
                   
Rent on shell,
insurance, rates
25 928 200 4 714.22 57 618.22 29.72 50 693 400 3 384.75 40 554.72 24.78 –28 –30
Total building cost 37 503 100 6 818.75 83 340.22 42.99 76 403 700 5 101.40 61 122.96 37.35 –25 –27
Occupancy                    
M&E maintenance 1 267 700 230.49 2 817.11 1.45 3 233 500 215.90 2 586.80 1.58 –6 –8
Lifts 29 300 5.33 65.11 0.03 56 500 3.77 45.20 0.03 –29 –31
Fabric 35 000 6.36 77.78 0.04 50 000 3.34 40.00 0.02 –48 –49
Planned replacements 5 212 000 947.64 11 582.22 5.98 10 781 400 719.86 8 625.12 5.27 –24 –26
External land 193 800 35.24 430.67 0.22 410 000 27.38 328.00 0.20 –22 –24
Internal planting 85 400 15.53 189.78 0.10 90 000 6.01 72.00 0.04 –61 –62
Cleaning 1 776 100 322.93 3 946.89 2.04 3 727 200 248.86 2 981.76 1.82 –23 –24
Waste 168 900 30.71 3 75.33 0.19 625 000 41.73 500.00 0.31 36 33
Electricity 1 772 100 322.20 3 938.00 2.03 5 700 000 380.58 4 560.00 2.79 18 16
Gas 510 600 92.84 1 134.67 0.59 1 900 000 126.86 1 520.00 0.93 37 34
Water 44 400 8.07 98.67 0.05 100 000 6.68 80.00 0.05 –17 –19
Internal moves 42 188 7.67 93.75 0.05 117 200 7.83 93.76 0.06 2 0
Security and reception 2 393 300 435.15 5 318.44 2.74 5 152 600 344.03 4 122.08 2.52 –21 –22
Postroom 1 694 950 308.17 3 766.56 1.94 4 290 000 286.44 3 432.00 2.10 –7 –9
IT/communications 29 700 000 5 400.00 66 000.00 34.05 84 333 300 5 630.85 67 466.64 41.23 4 2
Catering 2 175 000 395.45 4 833.33 2.49 5790 900 386.65 4 632.72 2.83 –2 –4
Management 2 625 000 477.27 5 833.33 3.01 1787 500 119.35 1 430.00 0.87 –75 –75
Sub-total 49 725 738 9 041.04 110 501.64 57.01 128 145 100 8 556.13 102 516.08 62.65 –5 –7
                   
Total over 25 years 87 228 838 15 859.79 193 841.86 100.00 204 548 800 13 657.53 163 639.04 100.00 –14 –16
Statistics                    
Cost/m2   15 860      13 658          
Cost/workstation   193 842      163 639          
Annual cost/workstation   7 754      6 546          
Estimated building infrastructure
cost/call handled
  1.43      1.22          
Vital statistics
Citex model Egg, Pride Park, Derby
Location North-east Midlands East Midlands
Function Call centre and support Communications centre, support and corporate departments
Workstations 450 1250
Area 5500 m2 14 977 m2
Occupation density 12.22 m2/occupant 11.98 m2/occupant
Hours of operation 16 hours/day 16 hours/day
Projected annual calls 2 444 700 6 723 000
Planned life 25 years 25 years
Comment on difference between the Citex model building and Egg, Pride Park, Derby
Model call centre Egg, Pride Park, Derby Comments
M&E maintenance All planned and reactive maintenance All planned and reactive maintenance Difference reflects economies of scale achievable
with enlarged building, and engineer undertaking
most reactive works within core hours
Lifts Two hydraulic lifts Two hydraulic lifts; two disabled lifts to mezzanine Cost difference reflects different number of lifts
Fabric All reactive maintenance All reactive maintenance Fabric maintenance is related to probability of incident rather than building size
Planned replacements     Cost difference results from economies of scale achieved with Egg building
External landscaping Monthly attendance during growing season Mixture of medium and low maintenance; full-time head gardener Additional cost of Pride Park reflects enhanced soft landscaping against Citex model
Cleaning Daily general cleaning, daytime attendance, weekly low-level and quarterly high-level window cleaning and twice yearly specialist IT cleaning Daily general cleaning (outside core hours), daytime attendance, weekly low-level window cleaning and quarterly specialist IT cleaning Cost difference is partly caused by economies of scale achievable in supervision and management in large Egg building. A major factor in difference in cost is that Egg has minimal elevational glazing and roof lights are “self-cleaning”
Waste Weekly general waste removal and monthly confidential waste removal Daily general removal, monthly confidential waste removal, monthly recycled waste removal Cost difference is due to general waste within model building being compacted before removal and longer collection period for confidential waste within model building
Electricity     Higher additional requirement for small power within Egg building. Citex model benefits from heat gain during winter periods
Gas     Citex model benefits from heat gain of glazed cladding panels
Internal moves 15% churn rate 15% churn rate  
Security and reception Monday to Friday 12 hours a day: one guard on
patrol, supervisor on control observation,
receptionist. Other hours: one guard and
supervisor
Monday to Friday, 7am-7pm: three guards on
patrol and control room observation, supervisor,
receptionist. Other hours: two guards and supervisor
Cost difference reflects economies of scale achievable with enlarged building. Actual resource required will depend on operating restrictions imposed by banking authorities
Post room Four staff from 9am-6.30pm 12 staff from 9am-5.30pm Cost difference is caused by increased operating hours within model building. However, a major element of Egg’s outgoing post function is carried out by a specialist reprographics contractor
IT/communications Three-year replenishment rate Three-year replenishment rate Citex model assumes less dependency on licensed software, but Pride Park benefits from economies of scale in desktop/network support
Catering Subsidised canteen, free drinks vending and corporate entertaining Subsidised canteen and vending and corporate entertaining Cost difference reflects compounded effect of free vending and fewer staff in Citex model. Egg building benefits from critical mass, so a more diverse menu is offered
Management Monday to Friday: one senior and one junior facilities manager, 12 hours a day; helpdesk operators 18 hours a day 12-hour operation provided via logistics co-ordinator (shared), site-bound FM; security manager (shared) Citex model incorporates helpdesk operation not provided by Egg but does not include specialist support. Egg example reflects best practice for operations spread across a portfolio of large sites and reflects economies of scale achievable
Staff and training costs
Total staff, training and
infrastructure cost/year (£)
Cost per occupant/
year (£)
Total additional cost/year (£)
(extra over 4-year retention period)
Additional cost per occupant/year (£)
(extra over 4-year retention)
4 years 15 840 700 35 202 n/a n/a
3 years 16 096 900 35 771 256 200 569
2 years 16 609 200 36 909 768 500 1 708
1 year 18 146 200 40 325 2 305 500 5 123
Note: Example assumes that operational and salary levels remain constant, and that the existing facility can accommodate additional staff training requirements. The example does not include the consequential losses to the business of reduced retention rates.
Detailed specification for the model retail banking call centre
Foundations Internal windows and doors Heating
Piles, caps and ground beams Combination of hardwood and steel doors Convection system via underfloor forced air system supplemented with perimeter fan-assisted convection radiators
Ground floor slabs Ceiling Ventilation
150 mm thick slab (powerfloat finish) Suspended lay in grid, acoustic tiling and panelling Comfort cooled via forced air displacement system to call centre. Variable air volume system to computer suite
Structure and envelope Floor finishes Hot and cold water services
Half brick/glazed curtain walling with external louvres
(to maximise light and minimise glare) to a two-storey
steel frame. Three-quarter-height glazed walls to
relaxation areas. Trocal roof with large rooflights
above restaurant and cores. Atrium to reception
Granite to entrance and lift lobbies, plywood decking to restaurant and rest areas, anti-static tiling and raised access floors to call centre, lino to back-of-house areas Domestic-type hot and cold water services
Internal partitions Wall finishes Lifts
Plasterboard and system partitions Three coats of emulsion to plasterboard walls. System partitioning self-finished Two eight-passenger hydraulic lifts
Floors Fixtures and fittings Security
Profile decked mezzanine with reinforced screed.
600 × 600 × 600 mm raised access floors
CCTV monitored tubestiles with door access to visitors.
External louvres to windows to maximise light but
minimise glare. Staff restaurant and small shop
Security cameras with on-site monitoring suite. Computerised access control system
Stairs Power Communications installations
Stainless steel spiral stairs Three phase to low voltage supply. Uninterrupted power supply (150 kVA) and one generator (800 kVA). Floor boxes for facilities management every 100 m2 Category 6 fibre optic/copper data cabling. Floor boxes every 10 m2 with 850 connectors
Windows and doors Lighting External works and landscaping
Double-glazed units within curtain walling. Matching single-skin doors and glazing to reception Mixture of gantry, strip and bulkhead lamps. Ambient lighting to minimise glare 80/20 split of hard/soft landscaping. Low maintenance
soft landscaping; no grass. 200 car parking spaces
with access control to/from car park. Covered
walkways from car park
Detailed specification for Prudential Banking, Point North, Dudley
Foundations Internal windows and doors Heating
Piles, caps and ground beams Hardwood veneered doors Sill line radiators
Ground floor slabs Ceiling Ventilation
150 mm thick slab (powerfloat finish) Suspended concealed grid, metal panel tiling and plasterboard Displacement ventilation plus static cooling.
Variable air volume system to computer suite
Structure and envelope Floor finishes Hot and cold water services
Concrete frame and precast concrete floors. Brick
façade with ribbon windows. Part curtain walling.
Six floors of structural floor to floor height of 4.6 m
Reconstituted stone in entrance and lift lobbies,
carpeting, plywood decking to restaurant and rest
areas, anti-static tiling and raised access floors to call
centre, lino and vinyl tiling to back-of-house areas
Domestic-type hot and cold water services
Internal partitions Wall finishes Lifts
Demountable and plasterboard partitions Three coats of emulsion to plasterboard walls. Coloured tiling in toilets Three eight-person hydraulic lift (one part goods) and small hydraulic goods lift
Upper floors Fixtures and fittings Security
Precast concrete planks with structural topping. 450 mm deep, 600 × 600 mm raised access floor tiles Security tubestiles with matching glazing to entrances. Horizontal vane sun blinds to windows. Staff restaurant Security cameras with on-site monitoring suite. Computerised access control system. Inergen and Vesda fire protection
Stairs Power Communications installations
Precast concrete escape stairs and metal feature staircase Three phase to low voltage supply. One uninterrupted power supply system (150 kVA). One 650 kVA generator, one 500 kVA generator and one 150 kVA generator. Floor boxes for FM every 200 m2 Category 5 fibre optic/copper data cabling.
Floor boxes every 10 m2 with 700 connectors
Windows and doors Lighting External works and landscaping
Double-glazed units within curtain walling. Matching single-skin doors and glazing to reception Uplighters in suspended ceiling 80/20 split of hard/soft landscaping. High maintenance soft landscaping. 450 parking spaces with access control to/from car park
Detailed specificACation for Egg, Pride Park, Derby
Foundations Internal windows and doors Heating
Piles, caps and ground beams Hardwood veneered doors Convection system via underfloor forced air system supplemented with fan-assisted convection radiators to isolated areas
Ground floor slabs Ceiling Ventilation
150 mm thick slab (powerfloat finish) and methane barrier Suspended concealed grid, metal panel tiling and
plasterboard. Pergola to reception
Comfort cooled via forced air displacement system to call centre. Variable air volume system to computer suite
Structure and envelope Floor finishes Hot and cold water services
Brick plinth, kingspan profile sheet cladding system to single-storey (10 m high) steel-frame incorporating mezzanine level. Glazed walls to relaxation areas. Profile metal sheet roofing system including rooflights to 10% of area Combination of reconstructed stone to entrance and lift lobbies, carpeting, plywood decking to restaurant and rest areas, anti-static tiling and raised access floors to call centre, lino and vinyl tiling to back of house Domestic-type hot and cold water services
Internal partitions Wall finishes Lifts
Concrete block and plasterboard partitions Three coats of emulsion to plasterboard walls. Timber panelling to training/meeting rooms. Rubber matting to recreation areas and coloured tiling/mosaics Three eight-person hydraulic lift (one part goods)
with two disabled lifts to mezzanines
Upper floors Fixtures and fittings Security
Profile decked mezzanine with reinforced screed.
600 × 600 × 600 mm raised access floor to
lower level, 300 mm deep, 600 × 600 mm
system to mezzanines
Security tubestiles with matching glazing to entrances. Horizontal window blinds. Mirrored walls to usability lab. MDF fittings to refreshment areas/kitchens. Archive racking to imaging centre. Staff restaurant and shop Security cameras with on-site monitoring suite. Computerised access control system
Stairs Power Communications installations
Precast concrete escape stairs and metal feature staircase Three phase to low voltage supply. Two uninterrupted power supply systems (150 kVA) and two generators (800 kVA). Floor boxes for FM every 200 m2 Category 6 fibre optic/copper data cabling. Floor boxes every 10 m2 with 850 connectors
Windows and doors Lighting External works and landscaping
Double-glazed units within curtain walling. Single-skin doors and glazing to reception Mixture of gantry, strip and bulkhead lamps 80/20 split of hard/soft landscaping. Medium maintenance soft landscaping. 500 parking spaces with access control to/from car park