Installation changes can cause problems but, as Karl Tryner of Krone explains, reworking can meet the most demanding flexibility requirements.
Downloads
Figure 1: Typical channel model
Other, Size 0 kbFigure 2: Measurement of NEXT on a 90 m run.
Other, Size 0 kb
Source
Electrical and Mechanical Contractor
Postscript
Karl Tryner is a structured cable specialist with Krone.