Welcome to building.co.uk. This site uses cookies. Read our policy.

TR17 summary of recommendations
Maximum permitted contamination of internal surfaces of extract ductwork 6 g/m2 (Vacuum test)
180 mm (Deposit thickness test)
Frequency of cleaning kitchen extract systems (dependent on usage of cooking equipment)Heavy use (12-16 h per day): 3 monthly
Moderate use (6 -12 h per day): 6 monthly
Light use (2-6 h per day): annually
Factors to consider when selecting a specialist contractor for extract ductwork cleaningExperience – years in business, track record and number of operatives;
Affiliation – membership of bodies such as the HVCA and NADCA;
Quality assurance;
Health and safety – policy, records of training, accidents and awards;
Insurance – professional indemnity, public and employers’ liability and all-risks;
Financial – competence to handle contracts of proposed size.
Size of access panels to be located every 3 m in horizontal circular ductsDuct size (mm)Opening size (mm)
200300 x 100
500400 x 200
1000450 x 450
Duct entry600 x 500