Mechanical suppliers
AHUs: Master Air
Boilers: Broag
Ceiling Diffusers: Ventac
Chillers: Coolair, Clivet
Control valves: Honeywell
Computer room air conditioning: Airedale, Coolair
Dampers: Season Control
DX systems: Daikin
Extract fans: Dan Chambers
Fan coil units: Finn Heat, Diffusion
Fire hose reels: Angus Fire
Floor grilles: Ventac
Flues: Insulated Chimney Ltd
Heat exchangers: BSS
Heat pump: Clivet
Hot water calorifiers: Hevac, State
Louvres: ASVS
Perimeter heating: Harland Johnston
Pumps: Wilo
Pressurisation: BSS
Radiant Panels: Harland Johnston
Radiators: Runtal
Smoke control louvres : Colt
Strainers: BSS
Tanks: Kilarney Plastics
Toilet extract: Dan Chambers
Underfloor heating: VCS, WIRSBO
Valves: BSS
Water boosters: Wilo
Electrical suppliers  
Controls: Cylon, Honeywell
CCTV: Screenguard
Cable management: Electrofast, Marshall Tufflex
Communications: Kedington, Bridgecom
Electrical accessories: MEM
Fire alarm/detection: Cooper, Menvier, Transmould
Floor boxes: Power Plan
Lifts: Thyssen
Lighting controls: Delmatic
Luminaries: Concord, Evolution
LV switchgear: Anord Switchgear
Motor control centres: TR Controls
Power busbar: Power Alphatrak
Specifications
Engineering data  
Gross floor area: 11 170 m2
Plant rooms: 200 m2
Offices: 7801 m2
Computer suite: 104 m2
Amenity & dining: 208 m2
Atrium: 550 m2
Contract details  
Tender date: May 1998
Tender system: Competitive
Form of contract: Modified GDLA
Contract period: 16 months
NES used: Yes
Design conditions  
1989 yearly weather Data  
Winter
Offices, meeting rooms, restaurant, recreation: 210C
Archives, atrium public areas: 180C
Library: 200C
Atrium desk area: 210C
Toilet areas: 180C
Summer  
Open-plan offices, and other
open-plan naturally ventilated areas:
<260C db not more than 2.5%
working hours (65 h/y).
Maximum peak temperature: 27.50C
Areas provided with cooling: 220C ±20C
Council chamber: 220C ±20C
Computer room: 220C ±20C
U Values (W/m2k)  
Walls: 0.44
Floor: 0.35
Roof: 0.26
South, east and west glazing: 1.7
North glazing: 1.9
Atrium glass wall: 5.1
Structural details  
Slab thickness: varies with profile
Clear floor void: 300 mm (most areas)
Computer room floor void: 500 mm
Floor to ceiling  
Central office area: 2.7 m
Near windows: 3.1 m
Occupancy  
Offices: 1 person/11 m2
Meeting rooms: 1 person/3 m2
Noise levels  
Offices: NR 35-40
Toilets & circulation: NR 45
Target energy use  
Total : 104 kWh/m2/y
BREEAM assessment: No
Loads  
Heating load: 600 kW
Installed heating capacity: 900 kW (300 kW standby)
Installed cooling capacity: 33 kW
Load breakdown  
Equipment: 15 W/m2
Lighting: 16 W/m2 (with 65% diversity)
Installed lighting: 15 W/m2
Distribution Circuits  
LTHW: 820C flow, 710C return
Underfloor: 550C flow, 450C return
DHWS: 600C flow, 500C return
Constant temp: 820C flow, 710C return
Electrical Supply  
Transformers: None (LV supply)
UPS: Small local units at
critical equipment
Coolant: R407c
Lighting  
Types: Primarily compact fluorescent uplighters and recessed downlighters
Lighting load: 157 kW
Lux levels  
Office: 500 lux
Conference rooms: 500 lux
Kitchen: 300 lux
Computer: 300 lux
Toilets, stairs and circulation: 150 lux
Costs
Costs (I£millions)  
Total cost: £12.5 million
Building services total  
Mechanical: £0.9 million
Electrical: £1.4 million (incl. data cabling)
Facade: £2.5 million
Total net cost: £1345/m2
Note: Costs increased considerably in Ireland since date of tender.  
Mechanical costs (£000/m2)  
Cold Water Services: £3.5
Hot Water Services: £2.5
Heating Services: £31.9
Cooling Services: £3.2
Ventilation: £8.5
Drainage: £1.89
Electrical costs (£000/m2)  
Meters & switchgear: £11.0
Lighting: £50.0
Power: £3.6 (excl. fit out)
Controls: £3.7
Fire alarms & detection: £8.2
Security: £6.3
Telephone & data: £17.5
Earthing, bonding and lightning protection: £0.93
Lifts: £10.7