Welcome to building.co.uk. This site uses cookies. Read our policy.

Table 1: peak winter
AHU ref Volume
(m3/s)
Pre-heat
required (kW)
Total heating
required (kW)
Heat
recovered (kW)
(% of total) ‘Free’ humidification
achieved (kg/h)
Approximate
humidification
power saved (kW)
AHU 6/1 5.15 56.75 151.35 85.76 56.7 96.21 81.78
AHU 6/2 9.69 106.78 284.74 161.35 56.7 181.02 153.86
AHU 6/3 10.33 113.81 303.48 171.97 56.7 192.93 163.99
AHU 6/4 5.31 58.49 155.99 88.39 56.7 99.16 84.29
 
Table 2: PEAK SUMMER
AHU ref Volume (m3/s)   ‘Semco’ wheel:
anticipated supply
air ‘off’ condition
    Design: supply air
‘off AHU’ condition
  Cooling & dehum
recovered (kW)
Cooling & dehum
recovered (Kw)
Approximate %
peak cooling
& dehum saved
  (Db 0C) (Wb 0C) Specific enthalpy (kJ/kg) (Db 0C) (Wb 0C) Specific
enthalpy (kJ/kg)
     
AHU 6/1 5.15 25.1 19.2 54 18 15 42 125.16 31.41 25
AHU 6/2 9.69 25.1 19.2 54 18 15 42 235.47 59.1 25
AHU 6/3 10.33 25.1 19.2 54 18 15 42 250.97 62.99 25
AHU 6/4 5.31 25.1 19.2 54 18 15 42 128.99 32.38 25