| Thickness mm | thermal resistance m2 °C/W | £/m2 | |
| Quilt insulation | |||
| Floors | |||
| Low-density glass-wool overslab between battens beneath timber boarding | 60 | 1.5 | 1.75-2.00 |
| Between ceiling or flat roof joists | |||
| Fibreglass quilt | 100 | 2.5 | 1.75-2.00 |
| Rock-wool insulation mats | 150 | 4.05 | 3.50-4.00 |
| Mineral-fibre mats | 200 | 5 | 4.00-4.50 |
| Flexible resin bonded slab (45 kg/m3) | 100 | 2 | 6.75-7.75 |
| Between roof rafters | |||
| Glass-wool insulation faced with laminate of kraft paper and polythene, stapled | 100 | 2.5 | 5.75-6.25 |
| External stud wall | |||
| Rock-wool insulation mats pinned vertically between studs | 100 | 2.7 | 3.25-3.50 |
| Glass-wool insulation faced with laminate of kraft paper and polythene stapled vertically between studs | 100 | 2.5 | 5.75-6.25 |
| Flexible resin bonded slab (45 kg/m3) | 100 | 2 | 8.00-10.00 |
| Internal stud wall | |||
| Resin-bonded glass-wool mat between studs | 50 | 1.32 | 2.80-3.60 |
| Board insulation | |||
| Below ground-floor slab | |||
| CFC-free rigid urethane foam insulation polyethylene-coated glass-fibre tissue faced both sides | 25 | 1.09 | 6.50-7.00 |
| Rigid extruded polystyrene insulation board (34 kg/m2) | 50 | 1.85 | 6.25-7.00 |
| Overslab beneath screed | |||
| Standard duty expanded polystyrene | 25 | 0.68 | 2.00-2.25 |
| Tissue-faced mineral-wool board with rebated edges 30 mm thick | 30 | 0.83 | 7.75-8.50 |
| Rigid resin bonded mineral-wool slab (140 kg/m3) | 50 | 1.52 | 11.75-12.75 |
| Flat roof | |||
| Tissue-faced bonded mineral-fibre slab (175 kg/m3) cut to falls | average 70 | 1.82 | 50.00-55.00 |
| Pitched roof across rafters | |||
| High-density mineral-wool slab overlay board | 40 | 1.11 | 7.50-8.50 |
| Glass-fibre reinforced rigid polyisocyanurate foam board, foil-faced both sides | 48 | 2.53 | 7.00-8.00 |
| Pitched roof between rafters | |||
| Rigid extruded closed-cell polystyrene foam insulation board | 50 | 2 | 3.75-4.25 |
| CFC-free rigid urethane foam board, foil/kraft-faced both sides | 50 | 2.17 | 8.50-9.50 |
| Cavity-wall insulation | |||
| Full fill | |||
| Blown mineral insulation | 75 | 1.92 | 4.50-5.00 |
| Mineral-fibre batts | 65 | 1.91 | 3.25-3.50 |
| Mineral-fibre batts | 100 | 2.78 | 3.50-4.00 |
| Glass-wool batts; treated with water-repellent silicone; two layers | 150 | 4.2 | 7.00-7.50 |
| Partial fill (costs exclude retaining ties) | |||
| Standard grade expanded polystyrene board with interlocking tongued-and-grooved edges | 50 | 1.35 | 4.50-5.00 |
| Semi-rigid glass wool batt treated with water-repellent silicone | 50 | 1.39 | 5.00-5.50 |
| Rigid urethane foam board faced both sides with aluminium foil 30 mm thick | 30 | 1.53 | 6.75 - 7.50 |
| Mineral-wool slab | 60 | 1.82 | 7.50 - 8.00 |
| Materials price changes | |
| change since spring/summer 1999 (%) | |
| Diamond drilling | +5 |
| Ready-mixed insitu concrete | +2 |
| Concrete blocks | +4.5 |
| Structural steelwork | +3 |
| Clay roof tiles | +2 |
| Roof insulation | +10 |
| Softwood/hardwood skirtings, architraves and frames | +3 |
| Garage doors | +5 |
| Expanded metal products | +3 |
| Wood preservatives | +5 |
| PVCu soil pipes and fittings | +7.5 |
| PVCu waste pipes and fittings | +7.5 |
| Bitumen macadam surfacing | +2 |
| Key indicators | ||
| % change in past six months | % change in 12 months to Jan 00 | |
| Retail prices index | ||
| Headline rate | +0.9 | +2 |
| All items, excluding mortgage interest payments – government’s target index | +0.7 | +2.1 |
| All items, excluding mortgage interest payments and indirect tax | +0.8 | +1.8 |
| Industry generally | ||
| Materials and fuel purchased by manufacturing industry | +6 | +10.4 |
| of which: materials | +5.1 | +12.4 |
| of which: fuel | +13.2 | –1.8 |
| Key indicators | ||
| % change in past six months | % change in 12 months to Jan 00 | |
| Materials and fuel purchased by manufacturing, excluding food, beverages, petroleum and tobacco industries | +3.9 | +0.6 |
| Output prices of manufactured goods | +0.9 | +2.5 |
| Output prices of manufactured products (other than food, beverages, petroleum or tobacco) | +0.7 | +0.5 |
| Construction industry | ||
| Construction materials | +0.5 | +0.2 |
| Housebuilding materials | +0.4 | +0.2 |
| Machinery and equipment | +0.7 | +0.8 |
| Electrical machinery and apparatus | +0.1 | –0.9 |
| Packages whose indices have fallen | ||
| Work category | Index title | % fall July 1999-January 2000 |
| Mar-18 | Cladding and covering: plastics | –7.8 |
| Mar-13 | Metal: decking | –4.2 |
| Mar-32 | Linings and partitions: self-finished | –2.5 |
| Mar-34 | Raised access floors | –2.5 |
| Mar-41 | Glazing | –1.6 |
| 03-Jun | Concrete: insitu | –0.7 |
| Mar-30 | Boards, fittings and trims: manufactured | –0.7 |
| Packages whose indices have risen | ||
| Work category | Index title | % rise July 1999-January 2000 |
| Mar-58 | Pipes and accessories: copper | +10.1 |
| Mar-22 | Cladding and covering: aluminium | +7 |
| 03-Mar | Filling: imported, hardcore and granular | +3.5 |
| Mar-24 | Cladding and covering: zinc | +3.5 |
| 03-May | Insulation | +3.5 |
| Mar-49 | Sanitary appliances | +2.9 |
| Mar-17 | Cladding and covering: coated steel | +2.7 |
| Mar-59 | Pipes and accessories: aluminium | +2.6 |
| Road construction TPI | |||||
| Year | 1Q | 2Q | 3Q | 4Q | Annual average |
| 1998 | 99 | 102 | 97 | 96 | 99 |
| 1999 | 93 | 104* | 100* | – | – |
| * provisional Source : DETR | |||||
| Constructed civils cost index | |||||
| (base 1970 = 100) | |||||
| Year | 1Q | 2Q | 3Q | 4Q | Annual average |
| 1998 | 1138 | 1152 | 1163 | 1156 | 1152 |
| 1999 | 1158 | 1166 | 1206 | 1213* | 1186* |
| * provisional | |||||
| Landscaping cost index | |||||
| (base 1976 = 100) | |||||
| Year | 1Q | 2Q | 3Q | 4Q | Annual average |
| 1998 | 442 | 445 | 466 | 466 | 455 |
| 1999 | 466 | 468 | 488 | 489* | 478* |
| * provisional | |||||
| Wage agreement summary for major wage-fixing bodies | |||
| Operatives | Agreement body | Wage rates effective since | Date of next review |
| Builders and civil engineering operatives | Construction Industry Joint Council | 28-Jun-99 | 26-Jun-00 |
| Early negotiations under way: initial union claims call for £10/hr for craft operatives, compared with the current £6.05/hr | |||
| Building & Allied Trades Joint Industrial Council (BATJIC) | 14-Jun-99 | 12-Jun-00Rates will rise 4.4% | |
| Plumbers | The Joint Industry Board for Plumbing Mechanical Engineering Services in England and Wales | 23-Aug-99 | Aug-00 |
| Scottish and Northern Ireland Joint Industry Board for the Plumbing Industry | 09-Aug-99 | Aug-00 | |
| Heating and ventilation operatives | Joint Conciliation Committee of the Heating, Ventilating and Domestic Engineering Industry | 23-Aug-99 | 04-Sep-00 |
| Electricians | The Joint Industry Board for the Electrical Contracting Industry | ||
| – main operatives | 07-Feb-00 | 08-Jan-01 | |
| – apprentices | 04-Oct-99 | Oct-00 | |
| Scottish Joint Industry Board for the Electrical Contracting Industry | 07-Feb-00 | 08-Jan-01 | |