Keep up to dateThe cost of going green | |||
Stars/house type | % better than building regulations | Lowest cost (£) | Highest cost (£) |
Three stars | |||
Terraced house | 25 | 1700 | 4000 |
High rise (over four storeys) | 25 | 1500 | 6000 |
Four stars | |||
Terraced housing | 44 | 2300 | 13,000 |
High rise (over four storeys) | 44 | 1700 | 16,600 |
Five stars | |||
Terraced house | 100 | ||
High rise | 100 | 28,000 | 32,000 |
Note: these figures are based on the cost of bringing a house up to a certain standard after the initial design stage. They also only reflect the cost of bringing a home up to the required standard of energy-use. | |||
Source: English Partnerships |