Manhattan Loft Corporation has completed the first phase of its £50m redevelopment of Ealing studios in west London. Phase one consists of three flexible office buildings, each between 1250 m2 and 1500 m2. The look is dominated by an exposed steel-frame and side-walls clad in cedar boarding. The architect is Burland TM, structural engineer is Buro Happold and QS is EC Harris.