Specialist access equipment was needed to complete the external fitting – spanning five floors of the building – and detailed liaison with local officials was required to ensure that business in and around the building would not be disrupted by the installation works. However, the work was successfully carried out on schedule and with the minimum of interruption.
Anglian’s safety and security window films are tested to BS6206 Class A and B.
Source
Glass Age