| Total build cost of the three standard specification models | |||
| Model | Area m2 | £ | £/m2 |
| Small | 1396 | 880,000 | 630 |
| Medium | 1523 | 940,000 | 617 |
| Large | 1784 | 1,190,000 | 667 |
| The standard specification includes: | |
| Low maintenance standing seam aluminium roof | |
| Acoustic steel lining panels spanning between the roof beams | |
| Curved steel roof beams located between the badminton courts | |
| Black tube, direct fired radiant heating to sports hall | |
| Solid beech floors to sports hall | |
| Low-energy compact fluorescent lighting to sports hall | |
| Comfort cooling in the fitness area and multipurpose room | |
| Ceramic tiles to floors and walls in the changing rooms/showers | |
| Profiled steel external wall cladding | |
| Large rooflights to the main changing areas | |
| Warm air supply and mechanical extract to changing areas | |
| Automatic doors to the main entrance lobby | |
| Windows with blinds between social area and sports hall | |
| Optional extras | |
| Glazed wall with blinds between social area and sports hall | £32,000 |
| Glazing to sports hall gable end wall (if north orientation) | £15,000 |
| Low velocity, ducted warm air heating to sports hall | £9,000 |
| Full public address system to all areas | £8,000 |