Keep up to dateTable 1: LPC test results | ||
Test | Failure time from ignition (minutes) | Comment |
Heavyweight frame only | 28 | Frame failed and dislodged fire-resisting panels |
Lightweight frame only | 23 | Frame failed and dislodged fire-resisting panels |
Aluminium bracket only | 29 | Brackets withstood fire but panels were dislodged |
Heavyweight frame with facade | 11·5 | Glazed elements failed and fire entered floor above |
Lightweight frame with facade | 13 | Glazed elements failed and fire entered floor above |
Lightweight frame with façade (real furniture used as source of fire) | 5 | Glazed elements failed and fire entered floor above |
Sprinkler on fire gases | No failure | Temperature was suppressed by water |
Internal drenching of glazing | 32 | Glazing was dislodged but fire did not spread |
External drenching of glazing | 32 | Glazing was dislodged but fire did not spread |