| Indicative costs of new Part M (buildings other than dwellings) | |
| Level approaches | |
| Level approaches from the site boundary and car parking spaces must have a surface width of 1500 mm with passing places or 1800 mm without the need for passing places. This approved provision has been increased from 1200 mm in the 1999 edition. | |
| New footpaths: | £40-50 per m2 (bitumen macadam) |
| £90-100 per m2 (brick paviors) | |
| Cost of widening existing footpaths: | £50-60 per m2 (bitumen macadam) |
| £90-110 per m2 (brick paviors) | |
| Ramped access | |
| If site constraints necessitate an approach of 1 in 20 or steeper, ramped access needs to be provided. Ramped access that satisfies the requirements now requires a reduced gradient, 1:15 maximum gradient for a 5 m going, compared to 1:12 previously. Surface width must be at least 1.5 m, compared with 1.2 m previously. | |
| Single ramp with single landing, low rise, reinforced concrete | £150-250 per m2 |
| Access into buildings | |
| Powered entrance doors must have a sliding, swinging or folding action controlled manually by push pad, card swipe, coded entry or remote control or automatically by a motion sensor or other proximity sensor. | |
| Automatic sliding double doors, aluminium, | |
| clear laminated glass, 1800 x 2400 m | £7000-8500 |
| Glass entrance doors should have manifestation on the glass at two levels. | |
| Cost of manifestation: 50 mm high continuous bands: | |
| Access within buildings | |
| Effective clear width through single leaf doors has been increased from 750 mm to 800 mm for new buildings. | |
| 1010 mm doorset, painted softwood panelled | £600-700 each |
| New developments should have a passenger lift serving all storeys. If site constraints preclude a passenger lift, a lifting platform may be allowed. | |
| Hydraulic lift serving two storeys, eight-person | £25,000-30,000 |
| Vertical platform lift with prefabricated enclosure, 3 m lift | £15,000-20,000 |
| Facilities in buildings | |
| A new section in the 2004 Approved Document covers “facilities in buildings other than dwellings”, covering audience and spectator facilities, refreshment facilities, sleeping accommodation and switches, outlets and controls. | |
| In sleeping accommodation, all bedrooms are required to have a visual alarm signal: | |
| installed to an existing fire alarm system | £200-300 each |
| Sanitary accommodation | |
| Any bath or wash basin tap should be controlled automatically or be capable of being operated using a closed fist e.g. by lever action. | |
| Wash basin pillar taps: extra for lever action | £15-30 each |
| A pricing document entitled Access Audit Price Guide was published by BCIS in 2002 providing advice on the cost of a range of typical building work required to comply with the DDA and Approved Document M 1999. | |
| Materical prices | |
| Key indicators | % change over last 12 months (Apr 2003 to Apr 2004) |
| Consumer prices | |
| Consumer Prices Index (CPI) | +1.2 |
| Retail Prices Index (RPI) | +2.5 |
| All items excluding mortgage interest payments (RPIX) | +2.0 |
| All items excluding mortgage interest payments and indirect taxes (RPIY) | +1.8 |
| Industry generally | |
| Materials and fuels purchased by manufacturing industry | +3.4 |
| of which materials | +3.0 |
| fuel | +7.1 |
| Materials and fuels purchased by manufacturing industry excluding food, beverages, tobacco and petroleum industries | -0.1 |
| Output prices of manufactured products | +1.8 |
| Output prices of manufactured products excluding food, beverages, tobacco and petroleum | +1.3 |
| Construction industry | |
| Construction materials | +2.2 |
| Housebuilding materials | +2.3 |
| Machinery and equipment (UK manufacture) | +1.2 |
| Electrical machinery and apparatus (UK manufacture) | +0.8 |
| Source: Office for National Statistics (April 2004 figures provisional) | |
| 1 March 2003 to March 2004 (DTI figures) | |
| Commodities | |
| Metals (three-month seller prices) | |
| Primary aluminium | +29.5 |
| Copper | +76.8 |
| Lead | +67.8 |
| Zinc | +35.5 |
| (Source: London Metal Exchange) | |
| Construction materials | |
| ONS identifies the following specific materials price changes in the past 12 months since April 2003 | |
| % change | |
| Carpets | +3.3 |
| Wood, sawn planed or impregnated | +6.6 |
| Timber windows, doors and frames | +9.7 |
| Oil-based paints | -2.8 |
| Plastic sanitary ware | +3.0 |
| Plastic doors and windows | +2.9 |
| Glass | -5.3 |
| Clay bricks and tiles | +4.4 |
| Concrete tiles, flagstones & bricks | +3.3 |
| Ready mixed concrete | -2.6 |
| Mortars | +6.0 |
| Bituminous mixtures | +4.3 |
| Steel tubes and fittings | +4.1 |
| Lead, zinc and tin products | +31.0 |
| Copper tubes and fittings | +27.0 |
| Insulated wires and cables | +4.0 |
| Kitchen furniture | +3.5 |
| Veneers, plywood etc (imported) | +5.5 |
| BUILDING CRAFT AND GENERAL OPERATIVES | |||||
| All-in hourly rates calculated over a year from 28 June 2004 | |||||
| Craft operative | General operative | ||||
| Wks | £ weekly | £ annual | £ per week | £ annual | |
| Wages at standard basic rate | |||||
| productive time | 44.3 | 320.58 | 14201.69 | 241.02 | 10677.19 |
| Lost-time allowance | 0.9 | 320.58 | 288.52 | 241.02 | 216.92 |
| Overtime | 5.8 | 480.87 | 2789.05 | 361.53 | 2096.87 |
| 17279.26 | 12990.98 | ||||
| Holiday Pay (incl. overtime allowance) | |||||
| Annual holidays | 4.2 | 382.28 | 1605.60 | 287.41 | 1207.13 |
| Public holidays | 1.6 | 382.28 | 611.66 | 287.41 | 459.86 |
| National Insurance | |||||
| (average weekly payment) | 48 | 34.43 | 1652.64 | 22.99 | 1103.52 |
| Employer’s contribution to | |||||
| Easybuild stakeholder pension | 52 | 7.50 | 390.00 | 7.50 | 390.00 |
| CITB Allowance (0.50% of payroll) | 97.48 | 73.29 | |||
| 21636.64 | 16224.77 | ||||
| Severance pay and sundry costs | Plus | 1.5% | 324.55 | 1.5% | 243.37 |
| 21961.19 | 16468.14 | ||||
| Employer’s liability and third-party insurance | Plus | 2% | 439.22 | 2% | 329.36 |
| Total cost per annum | 22400.41 | 16797.50 | |||
| Total cost per hour | 11.47 | 8.60 | |||
| No additional rates for skill or responsibility have been included in the calculations above. | |||||
| Assunptions within above calculation: | |||||
| Five days’ sickness allowed | |||||
| Time lost for inclement weather: 2% | |||||
| Number of productive hours per year: 1954 | |||||
| National Insurance at not contracted-out standard rate | |||||
| Minimum employer contribution to the Easybuild pension scheme is £2.50 per week but can rise to £10 per week to match an employee’s contribution: A contribution of £7.50 is allowed in the calculation above. | |||||
| Wage agreement summary | ||||
| Operatives | Agreement body | Wage rates effective since | Details in | Date of next review |
| Builders and Civil Engineering operatives | Construction Industry | 30 June 2003 | Cost Update 6 June 2003 | 28 June 2004 |
| Joint Council | Spon’s Architects’ and Builders’ Price Book 2004 | See above | ||
| Building & Allied TradesJoint | 9 June 2003 | Cost Update 6 June 2004 | 7 June 2003 | |
| Industrial Council(BATJIC) | Spon’s Architects’ and Builders’ Price Book 2004 | See above | ||
| Plumbers | The Joint Industry Board for Plumbing | January 2004 | Cost Update 5 March 2004 | 3 January 2005 |
| Mechanical Engineering Services in England and Wales | ||||
| Scottish and Northern Ireland Joint Industry | 22 March 2004 | See below | 30 May 2005 | |
| Board for the Plumbing Industry | ||||
| H&V operatives | Joint Conciliation Committee of the Heating, | 3 November 2003 | Cost Update 5 December 2003 | 4 October 2004 |
| Ventilating and Domestic Engineering Industry | ||||
| Electricians | The Joint Industry Board forthe Electrical | 5 January 2004 | Cost Update 5 March 2004 | Likely to be January 2005 |
| Contracting Industry | Spon’s Mechanical and Electrical Services Price Book 2004 | |||
| Scottish Joint IndustryBoard for the Electrical Contracting Industry | 5 January 2004 | Cost Update 5 March 2004 | Likely to be January 2005 | |