Construction has started on 3DReid Architects’
Co-operative Group head office in Manchester. The 15-storey, 325,000ft2 building is being built by Bam and is set to be completed in 2012.
All the latest updates on building safety reform
Construction has started on 3DReid Architects’
Co-operative Group head office in Manchester. The 15-storey, 325,000ft2 building is being built by Bam and is set to be completed in 2012.
2025-07-02T06:00:00Z By Thomas Lane
The IBM Building was a cut-down version of architect Denys Lasdun’s plans for a complementary neighbour to the National Theatre on the banks of the Thames. AHMM’s recent refurbishment, which sees the building brought firmly into the 21st century, means that original vision is now complete
2025-06-16T06:00:00Z By Ben Flatman
Ben Flatman visits the V&A’s new public store in east London, where the backstage world of conservation, curation and storage is placed front and centre
2025-05-28T06:00:00Z By Thomas Lane
Source: Shutterstock The embodied carbon of new homes can be reduced by using alternatives to carbon intensive brick such as the timber boarding on these homes at Aborfield Green, a new village in Berkshire More than 60% of a new home’s total carbon footprint is emitted before ...
2025-04-29T06:00:00Z By Thomas Lane
Source: Ella Wheatley The building is located in a courtyard at Manchester Metropolitan University. Source: Ella Wheatley The multifunctional laboratory can be used as a small workshop, an exhibition space or as a venue for lectures Source: Ella Wheatley The laboratory is ...
2025-04-11T06:00:00Z By Thomas Lane
The first test event to demonstrate that the stadium meets safety standards was held in February. A second one was held in March with the third and final event, which will feature a capacity crowd, will take place later this year before the season starts ...
2025-04-01T06:00:00Z By Thomas Lane
Extending the building wasn’t an option as it is hemmed in above, below and on all four sides
No comments yet