All Features articles – Page 305
-
Features
Infrastructure markets: saving grace
If there was one sliver of comfort in the Budget, it was that there were no further cuts to infrastructure spending. Victoria Jackson of Davis Langdon surveys the work that will be on offer in the years ahead
-
Features
Energy from waste: 'A wonderful place to be'
There’s going to be a £2bn-a-year building boom in energy-from-waste plants, like this one, over the next 15 years. Kristina Smith finds out how to turn base matter into gold
-
Features
In at the sharp end
The 60,686 acrylic spikes on Heatherwick Studio’s British pavilion have been the talk of the Shanghai Expo, as Stephen Kennett found out when he paid a visit. But how on earth was it all put together?
-
Features
Spotlight: Mass-produced components
We shouldn’t get too worked up about rising lead times in four contractor areas, says Brian Moone. It’s as much a reflection on raw materials in the supply chain as it is a sign of increasing work
-
Features
Here be dragons: Construction Dragon Boat Challenge
Who says the age of heroes is over? At the construction industry’s annual charity boat race, Alex Smith watched wannabe dragonslayers vie to see who was the strongest, fastest (and silliest)
-
Features
Consultants: The best way to beef up
As US giant URS subsumes Scott Wilson, Aecom closes in on Davis Langdon, and EC Harris prepares for a flotation, Tom Bill examines what the best options are for businesses looking to scale up
-
Features
Housing Design Awards: Living proof
It takes more than a numbing recession, constrained sites and nimbyism to stifle creativity in housing design. Martin Spring reviews the winners of this year’s Housing Design Awards
-
Features
Casci on life after Hamiltons: Small beast
Architecture was in shock earlier this year when Hamiltons, the UK’s 16th biggest practice, decided to split up. Former director Craig Casci talks to Emily Wright about the break-up, and about making sure his new company stays a manageable size
-
Features
EDF nuclear boss talkin' about his generation
Alan Cumming wants your help building EDF’s third-generation nuclear power plants, which, if all goes to plan, means four multibillion-pound projects and more than 150 contracts up for grabs
-
Features
Lead times - April to June 2010
An increase in reported enquiries in many trades has not yet been converted to orders, but lead times are already creeping up in four areas compared with only one last quarter
-
Features
Waiting for High Speed 2 to get here
The coalition has given its backing to a high-speed rail network in the UK, but there is a lot of uncertainty over how, when and in what form it will arrive
-
Features
Essential guides: Building Regulations
Essential need-know facts about Parts A to P of the Building Regs
-
Features
Essential guides: British Standards
A round-up of all the British Standards that are relevant to the construction industry
-
Features
Essential guides: BREEAM, LEED, Green Star & Estidama
Key information about the four main environmental assessment methods for buildings
-
Features
Stool of hard knocks
Karol Olszewski was on his lunchbreak near London’s High Holborn when he spotted this nonchalant window-fixer posing a significant danger to himself and passers-by
-
Features
Specialist costs: M&E services
M&E specialists are still in a contracting market, and face an ever-expanding set of challenges
-
Features
2012 countdown: The aquatics centre
Since the aquatics centre’s 160m-long roof was lowered into place last year, work on the Zaha Hadid-designed venue has continued to power ahead
-
Features
2012 countdown: The temporary basketball venue
The Olympics may need a basketball venue the size of an aeroplane hanger, but London can probably get by without one after they’re over. So they’ve made the whole thing demountable
-
Features
2012 countdown: Higgins on the big make or break year
David Higgins has spent the past two years trying to rebuild a swath of east London during the worst recession for decades. The ODA boss tells how he’s kept the project on track - and why the struggle isn’t over yet
-
Features
2012 countdown: Infrastructure
The Olympics isn’t just about show-stopping stadiums. In fact, the budget for venues is £700m less than the cost of the no-frills enabling works, roads and utilities